London Zoo

Área de elementos

Taxonomia

Código

Nota(s) de âmbito

  • London Zoo opened to Fellows of the Zoological Society of London, and to the public with a written order from a Fellow and payment of 1 shilling in 1828. The royal animal collection from the Tower of London was presented in 1831. In 1847 the public were admitted to London Zoo for the first time without an order from a Fellow. After the eruption of the Second World War, London Zoo was closed multiple times for over a week at a time starting 11:00am on 3rd September 1939, when all zoological places were closed by order of the government. On 27th September 1940, high explosive bombs damaged the Rodent house, the Civet house, the gardener's office, the propagating sheds, the North Gate and the Zebra house. In January 1941, the Camel house was hit, and the aquarium could not open until May 1943 due to extensive bombings.

Nota(s) da fonte

    Mostrar nota(s)

      Termos hierárquicos

      London Zoo

      London Zoo

      Termos equivalentes

      London Zoo

        Termos associados

        London Zoo

          531 Descrição arquivística resultados para London Zoo

          236 resultados diretamente relacionados Excluir termos específicos
          Tenlon, S S
          SEC/6/55 · Documento · 1848-1849
          Parte de ZSL Secretaries

          Letters from S S Tenlon to David William Mitchell regarding the New Pheasantry, a building and enclosure for the aurochs, and for an addition to the Giraffe House at the Zoological Society of London

          ZSL Main Office plans
          ARC/3/1 · Documento · 1909-1910, 1964-1967
          Parte de Architecture and buildings

          Plan, section and elevation drawings relating to the construction of the ZSL Main Offices (and Library) at Regent's Park, dated January 1909 to March 1910. Included are details of elements reused from Hanover Square. Alterations to Library, 1964-1967. Some hand annotations and doodles. Architect/engineer/designer: J Belcher, Architect; Werner, Pfleiderer & Perkins Ltd, Engineers; J Jeffreys & Co, Heating and Ventilation Engineers; A Smith & Stevens, Lift Engineers. 

          Aquarium plans
          ARC/4/1 · Documento · 1922-1926
          Parte de Architecture and buildings

          Plan, section and elevation drawings and blueprints relating to the construction of the Aquarium, London Zoo, dated July 1922 to August 1923. Also included are typewritten notes on the tank specifications; one sheet giving details for doors of the tea pavillion on the Mappin Terrace, dated February 1926. Some hand annotations and watercolour details added. Architect/engin

          Aquarium plans
          ARC/4/2 · Documento · 1913, 1922-1923, 1956
          Parte de Architecture and buildings

          Plan, section and elevation drawings relating to the construction of the Aquarium, London Zoo, dated May 1922 to March 1923, and the remodelling, dated April to May 1956. Also included is a section blueprint of the proposed aquarium planned with the construction of the Mappin Terrace, dated April 1913. Some hand annotations and watercolour details added. Architect/engin eer/designer: Sir Alexander Gibb & Partners, Engineers; Belcher & Joass, Architects; CA & AW Haward Ltd, Engineers; ZSL Architects' Department. 

          Aquarium estimate and agreement etc
          ARC/4/3 · Documento · 1922-1924
          Parte de Architecture and buildings

          Estimate for the Formation of the Proposed Aquarium under the Mappin Terraces, 1922; Building Contract between ZSL and J Jarvis & Sons, 1922; notes on progress, 1923; details of costs, 1924; plan of new flue pipe in the Aquarium, undated.