Penguin Pool

Elements area

Taxonomy

Code

Scope note(s)

  • The Penguin Pool was built on the site of goose paddocks. The commission for its design went to Tecton and followed the reception given to their revolutionary Gorilla House. Lubetkin was given liberty to design an exhibition piece, a non-naturalistic stage for the antics of the penguins that avoids any appearance of caging. Built 1934, brief by Sir Peter Chalmers Mitchell, Secretary, Dr Geoffrey Marr Vevers, Superintendent, and David Seth-Smith, Curator of Birds and Mammals; Tecton (Berthold Lubetkin and Lindsey Drake), architects; J L Kier and Company (with Ove Arup and Felix Samuely as structural engineers), general contractors. Cost about £2,000. Refurbished 1985-87, Avanti Architects (John Allan), with Berthold Lubetkin and Arup Associates. Cost about £280,000, with grants from English Heritage and Peter Palumbo. Grade I listed. The Penguins were moved to a pool on Barclay Court in 2004. Penguin Beach opened in 2011.

Source note(s)

  • The Buildings of London Zoo

Display note(s)

    Hierarchical terms

    Penguin Pool

    Penguin Pool

      Equivalent terms

      Penguin Pool

        Associated terms

        Penguin Pool

          1 Archival description results for Penguin Pool