Mostrar 291 resultados

Descrição arquivística
6 resultados com objetos digitais Mostrar resultados com objetos digitais
Correspondence with Buckingham Palace
ROY/3 · Documento · 1936-1967
Parte de Royalty

Correspondence between the Zoological Society of London and Buckingham Palace on topics such as admission tickets for the Gardens at Regent's Park and Whipsnade Park, the election of Vice-Presidents at the Zoological Society of London, the naming of the Snowdon Aviary, reports of the Annual General Meeting and Council meetings and luncheons for the Duke of Edinburgh

Elephant House
ARC/7 · Série · 1937-1971
Parte de Architecture and buildings

The existing 1868 Elephant House at London Zoo was demolished and the foundations laid for a new Elephant House; however work stopped in 1939 because of the outbreak of World War II and the Tecton designed Elephant House was never built. A new building designed by Casson Conder and partners was completed in 1965.

ARC/7/1 · Documento
Parte de Architecture and buildings

Includes: memos from the Layout Committee; letters from Lubetkin to Huxley; costings; Contract with Tecton; copy of 'The Architect and Building News', June 1944; handwritten notes; specifications. Includes correspondence with Burnet, Tait and Lorne; and with Tecton. Also mentions other abandoned schemes by Tecton for Gibbon House, Children's Zoo, South Gate. Includes correspondence between Huxley and the Maharajah of Bhavnagar and J Ellerman about funding; with Sir Harry Boyd of the Home Office concerning Royal patronage. Correspondence with Zoo Directors in Chicago, Dresden, Stellingen about their elephant houses.

Primate House
ARC/10/1 · Documento · 1956-1974
Parte de Architecture and buildings

Papers regarding the Michael Sobell Pavilions for Apes and Monkeys at ZSL London Zoo, including Council minutes, memorandums, briefs, plans and correspondence