Showing 818 results

Archivistische beschrijving
21 results with digital objects Show results with digital objects
The New Aquarium
CUR/2/3 · Stuk · 1920s
Part of Curators and Keepers

Article about the new Aquarium at London Zoo. E G Boulenger was appointed Director, after he superintended the construction

Pittman, Captain C R S
CUR/7/3/18 · Bestanddeel · 1949
Part of Curators and Keepers

Correspondence with Captain C R S Pittman regarding the establishment of a herd of Watussi Cattle at Whipsnade

LEG/6/16 · Bestanddeel · 1962
Part of Legal

Agreement and Schedule of Conditions of Building Contract between ZSL and Leonard Fairclough (London) Ltd. to construct a New Aviary. Includes Bill of Quantities and 2 sets of duplicate plans